Step-by-Step FESCO Net Metering Guide (Requirements & Timelines)
Pre-requisite: The 3-Phase Meter
To qualify for net metering, your house must already have a FESCO 3-Phase meter. If you have a single phase, you must upgrade it first.
The Real Timeline
The standard process involves several regulatory hurdles:
- FESCO SDO Audit: They inspect your setup for proper earthing and breaker compliance.
- NEPRA License: NEPRA issues the actual Generation License. This takes the longest (4 to 6 weeks).
- Demand Notice & Installation: Once the license is granted, you pay the FESCO demand notice, and the Green Meter is installed.
The realistic total timeline is 2.5 to 3 months from installation to FESCO meter activation. At SheikhX Solar, we handle this entire bureaucratic process transparently so you don't have to visit a single office.